“Fantastic company! Jack was honest, professional and extremely knowledgeable. He explained everything that was wrong in great detail. Will definitely be calling him for any future plumbing needs.”
Bathroom Remodel Plumbing Done Right
The showers people want now — rain head, body sprays and a hand shower, all running at once — ask more of a supply system than the house was ever built to give. That is the conversation to have before the tile is ordered, not when the water pressure disappoints on day one.
Financing from Wisetack
Split a water heater, repipe or full remodel into predictable monthly payments. Instant decision, no hidden fees, no compounding interest. See how it works.
2-Year Workmanship Guarantee
Every repair, replacement and remodel we complete is backed in writing. If our workmanship fails, we come back and put it right at no charge. What's covered.
The things that decide a bathroom remodel
- Supply capacity. Multiple outlets need a valve and a supply sized for their combined flow.
- Drain position and slope. Moving a toilet is a floor job, not a wall job.
- Waterproofing. The pan and the drain assembly have to work together — we coordinate with your tile setter rather than handing over and hoping.
- Wall-hung fixtures. Carriers go in at framing stage or they do not go in at all.
Rough-in, then trim
We set the tub or pan, rough the valves at the heights your design calls for, and pressure test before the walls close. Trim-out happens after tile, and we adjust every valve and test every joint before you use it.
Ageing in place
Curbless showers, grab-bar blocking and comfort-height fixtures are all far cheaper to build in now than to retrofit later. Worth asking about even if it is not on the drawings.
What's included
- Multi-outlet shower systems sized properly
- Tub, shower pan and drain assembly
- Toilet and vanity relocation
- Wall-hung fixture carriers
- Curbless and accessible layouts
- Coordination with tile and waterproofing crews
Bathroom Remodel Plumbing — questions we get asked
Can I have a rain head and body sprays?
Yes, if the supply and the valve are sized for the combined flow. That usually means a high-flow thermostatic valve and sometimes a larger supply run to the bathroom. It is a straightforward thing to build in and an expensive thing to add later.
How long does the plumbing take on a bathroom remodel?
Rough-in is typically two to three days, trim-out one. The gap between them is set by your tile and drywall schedule, not by us.
Do you handle the permit?
Yes. We pull the plumbing permit, schedule the rough and final inspections, and hand you the sign-off at the end.
Bathroom Remodels near you
We cover these areas for remodeling & custom builds. Each page is written for that town.
Other remodeling & custom builds services
Kitchen Remodel Plumbing
Moving a sink two feet sounds trivial until you find out what is under the floor. Kitchen plumbing is governed by…
Learn moreOutdoor Living & Pool House Plumbing
Outdoor plumbing has one problem indoor plumbing does not: winter. Every line, every fixture and every drain outside…
Learn moreLuxury Fixture Upgrades
You can transform a bathroom without touching the tile. New valves, a thermostatic shower system, a wall-hung…
Learn moreNew Kitchen & Bathroom Plumbing
Putting a kitchen or a bathroom where there was not one before is a different job from replacing the one that is…
Learn moreReady to get it sorted?
Free estimates, upfront pricing, and a licensed plumber who explains what is actually wrong. Call us or send a message and we will come back to you fast.